top of page

How to compare three bathroom renovation quotes on the same scope of work

Writer: yoan talbourdet
yoan talbourdet
11 hours ago
2 min read

The €7,100 quote looks more attractive than the €7,600 one. But who buys the vanity unit, moves the socket by the mirror and pays for tile delivery? Before choosing a contractor, work out what you would still have to pay to get the finished bathroom.


Describe the bathroom you want all three contractors to deliver


One page is enough. List the floor and wall areas to be tiled, the height of the tiling, which fittings will stay or go and the models you have selected. Say whether the shower and vanity will stay where they are. Moving a drain changes the work involved.


Use the same list of work for all three quotes. Mark each item as included, extra, not applicable or to be confirmed. If the quote says nothing about an item, leave it open. If two quotes offer different shower screens, ask for their model numbers and sizes before comparing prices.


Work out your total outlay, including what you buy yourself


Start with each quote’s total including VAT. Add only work or purchases you still need that the quote excludes, including VAT and delivery. If the contractor has priced an item that you decide to buy yourself, ask them to confirm the deduction in writing before adding your purchase. That way, the vanity or tiles appear in your total only once.


A worked example with three fictional quotes


The three offers below cover the same bathroom. These figures illustrate the calculation. Every extra in this example has a price.


Quote

Quoted price incl. VAT

Extras

Comparable total

A

€7,100

€1,340

€8,440

B

€7,600

€590

€8,190

C

€8,300

€0

€8,300


Quote A leaves you to cover €300 for electrical work, €450 for floor and wall finishes, €500 for the vanity and €90 in other costs. For B, the extras are €350 for plumbing, €180 for painting and €60 in other costs. C includes the full project. Once all three cover the same work, B costs €250 less than A and €110 less than C.


Six questions to ask before signing


  • Who removes the old fittings and takes away the rubble? Is protection for access routes included?

  • What repairs and surface preparation before tiling are included, especially in the shower area?

  • Who supplies the shower tray, waste, mixer, screen, vanity and fixings? Can you specify the models?

  • Which water supply lines, drains, sockets and ventilation work does the quote cover?

  • Does the price include grout, edge trims, painting the remaining surfaces and delivery?

  • For each item I must cover, what is the price including VAT, and who handles extra work uncovered during preparation?


Ask for important answers in writing. Compare the schedule and payment terms as well as the price. Keep the total provisional while any essential item is unpriced. One missing figure can change which quote comes out cheapest.


 
 
 

Comments


bottom of page